Our production process is highly automated, supplemented by the manual labor of our certified professionals. Each product is carefully designed, 3D drawn, tested and CE approved.

Collecting raw materials

The raw materials – profiles, strips, and sheet material – are collected and prepared for production.

Making parts

The plasma cutter ensures that all special pieces are cut to size (nested) with a minimum of waste. Our machine can handle sheet material from 2m to 6m wide. With the automatic saw, all profiles and strips are cut to size. The CnC machine takes care of milling, drilling or tapping, and where necessary, parts are folded in the bending machine at the right angle.

Welding

The individual parts are either welded together by robot or by one of our certified welders.

Always delivered with CE certificate & SGS report

Bomaco supplies every product with a CE certificate and commissioning report from SGS.

Dealers

For the purchase of lifting and hoisting equipment, we connect you with a dealer in your region.

Would you like to offer Bomaco lifting equipment yourself? Contact us to become an official dealer.

Contact us

Cleaning and painting

The product is then cleaned and spray painted in the desired colour. After curing it goes on to the final assembly.

Assembly

Final assembly and finishing of the end product.

Testing and inspection

All our products are tested by an external independent body (SGS) for: 

  • excess weight (test of strength of material, welding seams, etc.) 
  • visual inspection of welding seams and any deflection (so that there can be no permanent deformation) 
  • the user-friendliness of the design

Customization

Customization is possible as well. Based on your request, we will deliver a quote. We then draw up a design; the calculations and risk analyses are done by an independent external engineer. This way, each article can receive a CE inspection. Customization requires a delivery time of approximately 3 weeks, depending on the size of the project.